Electrician Records Retention
The Electrician Records Retention carries 11 published figures read from 5 sources' own pages, from 1 to 30 year, read 21 November 2026.
- 71 to 5.83
- 5.83 to 10.67
- 10.67 to 15.5
- 15.5 to 20.33
- 20.33 to 25.17
- 425.17 to 30
Bands
| Bucket | Value |
|---|---|
| 1 to 6 | 7 figures |
| 6 to 11 | 0 figures |
| 11 to 16 | 0 figures |
| 16 to 20 | 0 figures |
| 20 to 25 | 0 figures |
| 25 to 30 | 4 figures |
Read in full on 21 November 2026: 5 of 11 named sources state a figure; 6 state none.
By record type
| Breakdown | Median | Range | Sources |
|---|---|---|---|
| record type CIS deduction records | 3 year (one figure) | one figure, no range | 1 |
| record type employee medical records (duration of employment plus 30 years) | 30 year (one figure) | one figure, no range | 1 |
| record type employee exposure records | 30 year (one figure) | one figure, no range | 1 |
| record type exposure monitoring background data | 1 year (one figure) | one figure, no range | 1 |
| record type substance identity record (in lieu of SDS) | 30 year (one figure) | one figure, no range | 1 |
| record type analyses using exposure or medical records | 30 year (one figure) | one figure, no range | 1 |
| record type OSHA 300 Log, privacy case list, annual summary and 301 forms | 5 year (one figure) | one figure, no range | 1 |
| record type Davis-Bacon payrolls and basic records (3 years after prime contract completion) | 3 year (one figure) | one figure, no range | 1 |
| record type Davis-Bacon certified payrolls (3 years after prime contract completion) | 3 year (one figure) | one figure, no range | 1 |
| record type Davis-Bacon contracts, subcontracts and related documents (3 years after prime contract completion) | 3 year (one figure) | one figure, no range | 1 |
| record type PAYE records (3 years after end of tax year) | 3 year (one figure) | one figure, no range | 1 |
The figures, source by source
Each row is one published figure: what the source's own page states, a link to that page and the date we read it. Nothing appears here that a source did not publish.
Each figure in its source's own words (11)
- eCFR :: 29 CFR 1910.1020 -- Access to employee exposure and medical records., read 2026-11-11:
The medical record for each employee shall be preserved and maintained for at least the duration of employment plus thirty (30) years, except that the following types of records need not be retained for any specified period:
- eCFR :: 29 CFR 1910.1020 -- Access to employee exposure and medical records., read 2026-11-11:
Each employee exposure record shall be preserved and maintained for at least thirty (30) years, except that:
- eCFR :: 29 CFR 1910.1020 -- Access to employee exposure and medical records., read 2026-11-11:
(B) Material safety data sheets and paragraph (c)(5)(iv) records concerning the identity of a substance or agent need not be retained for any specified period as long as some record of the identity (chemical name if known) of the substance or agent, where it was used, and when it was used is retained for at least thirty (30) years; 1 and
- eCFR :: 29 CFR 1910.1020 -- Access to employee exposure and medical records., read 2026-11-11:
Each analysis using exposure or medial records shall be preserved and maintained for at least thirty (30) years.
- eCFR :: 29 CFR 1904.33 -- Retention and updating., read 2026-11-21:
You must save the OSHA 300 Log, the privacy case list (if one exists), the annual summary, and the OSHA 301 Incident Report forms for five (5) years following the end of the calendar year that these records cover.
- What you must do as a Construction Industry Scheme (CIS) contractor: Record keeping - GOV.UK, read 2026-11-07:
If you made deductions, you must also keep records of the costs of materials the subcontractor invoiced you for, excluding VAT. Keep these details for at least 3 years after the end of the tax year they relate to.
- eCFR :: 29 CFR 5.5 -- Contract provisions and related matters., read 2026-11-07:
All regular payrolls and other basic records must be maintained by the contractor and any subcontractor during the course of the work and preserved for all laborers and mechanics working at the site of the work (or otherwise working in construction or development of the project under a development statute) for a period of at least 3 years after all the work on the prime contract is completed.
- eCFR :: 29 CFR 5.5 -- Contract provisions and related matters., read 2026-11-07:
The contractor or subcontractor must preserve all certified payrolls during the course of the work and for a period of 3 years after all the work on the prime contract is completed.
- eCFR :: 29 CFR 5.5 -- Contract provisions and related matters., read 2026-11-07:
The contractor or subcontractor must preserve these contracts, subcontracts, and related documents during the course of the work and for a period of 3 years after all the work on the prime contract is completed.
- CH14700 - Record Keeping: How long must records be retained for: PAYE and Construction Industry Scheme - HMRC internal m, read 2026-11-07:
If the person is an employer or makes payments within the Construction Industry Scheme, they must retain their PAYE and/or Construction Industry Scheme records for 3 years after the end of the tax year to which they relate.
- eCFR :: 29 CFR 1910.1020 -- Access to employee exposure and medical records., read 2026-11-11:
(A) Background data to environmental (workplace) monitoring or measuring, such as laboratory reports and worksheets, need only be retained for one (1) year as long as the sampling results, the collection methodology (sampling plan), a description of the analytical and mathematical methods used, and a summary of ot
Sources with no stated figure
These 6 named sources were read on the dates shown and state no figure. They are part of the count and stay blank.
- The Control of Asbestos Regulations 2012, read 2026-10-08: read in full and no accepted figure on the page
- Employers must provide exposed employees access to their medical and exposure records. | Occupational Safety and Health, read 2026-11-07: every candidate on the page was refused
- The Control of Asbestos Regulations 2012, read 2026-10-08: read in full and no accepted figure on the page
- eCFR :: 29 CFR 516.5 -- Records to be preserved 3 years., read 2026-11-07: every candidate on the page was refused
- The Electrical Safety Standards in the Private Rented Sector and Social Rented Sector (England) Regulations 2020, read 2026-10-08: every candidate on the page was refused
- The Building Regulations 2010, read 2026-11-07: every candidate on the page was refused
How the figures are worked out
We read every named source's page ourselves, keep the exact sentence holding the figure, and record a fingerprint of the page as it stood on the read date.
5 of the 11 sources we could read publish a figure; 6 do not and are shown as not publishing; 1 were blocked or gone and are left out.
Summary figures (median, low, high, quartiles) count each source once for every breakdown it prices, 11 figures in year.
60 candidate sentence(s) failed review, each with its reason kept.
The fuller analysis planned for this dataset, beyond each source's own figure: per record type and jurisdiction: the statute or rule, the retention period and its trigger; the union of what must exist on file, which is the seller's inventory
We set aside 60 candidate sentences found on these pages, each with a written reason from the reviewer.
Source list (12)
- The Control of Asbestos Regulations 2012(publisher's terms apply; quoted for reporting)
- What you must do as a Construction Industry Scheme (CIS) contractor: Record keeping - GOV.UK(publisher's terms apply; quoted for reporting)
- Employers must provide exposed employees access to their medical and exposure records. | Occupational Safety and Health(publisher's terms apply; quoted for reporting)
- eCFR :: 29 CFR 1904.33 -- Retention and updating.(publisher's terms apply; quoted for reporting)
- CH14700 - Record Keeping: How long must records be retained for: PAYE and Construction Industry Scheme - HMRC internal m(publisher's terms apply; quoted for reporting)
- The Control of Asbestos Regulations 2012(publisher's terms apply; quoted for reporting)
- eCFR :: 29 CFR 1910.1020 -- Access to employee exposure and medical records.(publisher's terms apply; quoted for reporting)
- The Construction (Design and Management) Regulations 2015(publisher's terms apply; quoted for reporting)
- eCFR :: 29 CFR 5.5 -- Contract provisions and related matters.(publisher's terms apply; quoted for reporting)
- eCFR :: 29 CFR 516.5 -- Records to be preserved 3 years.(publisher's terms apply; quoted for reporting)
- The Electrical Safety Standards in the Private Rented Sector and Social Rented Sector (England) Regulations 2020(publisher's terms apply; quoted for reporting)
- The Building Regulations 2010(publisher's terms apply; quoted for reporting)
Take this figure with you
The Electrician Records Retention carries 11 published figures read from 5 sources' own pages, from 1 to 30 year, read 21 November 2026.
Read in full on 21 November 2026: 5 of 11 named sources state a figure; 6 state none.
Electrician Records Retention, record type CIS deduction records: median 3 year across 1 source, read 21 November 2026.
Electrician Records Retention, record type employee medical records (duration of employment plus 30 years): median 30 year across 1 source, read 21 November 2026.
Electrician Records Retention, record type employee exposure records: median 30 year across 1 source, read 21 November 2026.
Electrician Records Retention, record type exposure monitoring background data: median 1 year across 1 source, read 21 November 2026.
Electrician Records Retention, record type substance identity record (in lieu of SDS): median 30 year across 1 source, read 21 November 2026.
Electrician Records Retention, record type analyses using exposure or medical records: median 30 year across 1 source, read 21 November 2026.
Electrician Records Retention, record type OSHA 300 Log, privacy case list, annual summary and 301 forms: median 5 year across 1 source, read 21 November 2026.
Electrician Records Retention, record type Davis-Bacon payrolls and basic records (3 years after prime contract completion): median 3 year across 1 source, read 21 November 2026.
Electrician Records Retention, record type Davis-Bacon certified payrolls (3 years after prime contract completion): median 3 year across 1 source, read 21 November 2026.
Electrician Records Retention, record type Davis-Bacon contracts, subcontracts and related documents (3 years after prime contract completion): median 3 year across 1 source, read 21 November 2026.
Electrician Records Retention, record type PAYE records (3 years after end of tax year): median 3 year across 1 source, read 21 November 2026.
Credit as: "sellelectriciandatatoai.com Electrician Records Retention", updated 2026-11-21, https://sellelectriciandatatoai.com/datasets/electrician-records-retention/.
Download as CSV (11 rows, updated 2026-11-21)
Questions this data answers
Which records must a electrical contracting firm keep by law in GB and the US, and for how long?
The Electrician Records Retention carries 11 published figures read from 5 sources' own pages, from 1 to 30 year, read 21 November 2026.
Where do the figures in the Electrician Records Retention come from?
Every figure is quoted from its source's own page and dated (last read 21 Nov 2026). 11 named sources were read and 5 publish a figure; the 6 that publish none are recorded as not published, never estimated.